Skip to content

Slabs & Foundations - Arlington, TX

Slabs & Foundations

Start a shop, shed, garage or carport with a slab scoped for the structure and its use. Share your city, dimensions and building plans so we can review site preparation, reinforcement and anchoring requirements.

01

What we pour

Planning a steel shop or barndominium shell? CJM Metals can review the building layout with us so the footprint, foundation and anchor layout are coordinated before the pour.

Most of our slab work is a pad for something that arrives afterward: a metal shop or storage building, a prefab shed, a detached garage or workshop, a carport, a hot tub, a generator or an AC condenser. We work from the building's footprint and anchor layout, so the slab matches the structure instead of the structure being shimmed to fit the slab.

Carport pads are a family job: we pour the slab and set the anchor bolts to the post layout, and CJM Metals builds the steel carport on top of it. Equipment pads are small but not casual — an AC pad that tilts toward the house sends condensate at the foundation — so we compact the base and pitch every pad away from the structure.

02

Thickness, rebar and edges

Four inches carries foot traffic and a lawn mower. A shop floor that will see a vehicle, a lift or a loaded trailer should be 5 to 6 inches, with a thickened footing under any heavy point load. If a building supplier or engineer gives us a spec, we pour to the spec.

Reinforcement is a rebar grid, typically #3 or #4 bar at 16 to 24 inches on center both ways, tied and held on chairs so it sits in the middle of the slab instead of on the dirt. For a building we pour a monolithic turn-down slab: the edge thickens to 12 inches or more with two runs of bar, poured in one piece with the floor, so the footing has no cold joint for water to find.

03

Subgrade, base and vapor barrier

The ground under a slab in Arlington is clay that swells when wet and shrinks when dry, so we strip topsoil and organics, grade to a consistent depth and compact a layer of crushed base, usually 4 inches. Pouring directly onto raked dirt is the fastest way to a cracked floor.

Under an enclosed building we lay a polyethylene vapor barrier over the base before the steel goes in; without it, ground moisture migrates up through the slab and shows up as sweating floors, rusted tools and peeling paint. Open carports and outdoor equipment pads do not need one. Finished slab elevation sits above the surrounding grade, and where a slab meets an existing driveway or the house we set an expansion joint.

04

Anchor bolts, joints and cure

Anchor bolts, straps or post bases go in wet, set to the building's bolt pattern and held to line while the concrete takes its set. Send us the anchor drawing and we set to it: cast-in bolts are stronger than drilled-in anchors and save the installer a day.

Control joints get cut within the first day at roughly 2 to 2.5 times the slab thickness in feet, so every 8 to 10 feet at 4 inches and every 12 to 15 at 6. Plan the build schedule around the cure: cars off for 7 days on a 4 or 5-inch slab and 10 days at 6 inches, heavy equipment and loaded trailers 14 to 28 days. Details are on the curing time FAQ.

05

Permits and engineering in Arlington

The City of Arlington's DIY permit guide says a storage shed over 100 square feet requires a permit, so only the smallest sheds are exempt. A shop or a detached garage needs a building permit before work starts, carports and patio covers have their own rules, and setbacks, easements and HOA rules apply either way. Confirm what your lot allows with the One Start Development Center, 101 W. Abram St, 817-459-6502.

On expansive clay the City may ask for a sealed foundation design from an engineer on a larger garage or workshop. Many metal-building suppliers ship engineered drawings with the kit and we pour to those; if yours does not, we will tell you up front and can point you to an engineer. We put in writing who is pulling the permit — see the concrete permit process — and confirm the path before you order the building.

— What we offer

Engineered thickness

4 inches for light duty, 5 to 6 for shops and vehicles, sized to the load or the supplier's spec.

Turn-down monolithic edge

Thickened perimeter beam poured in one piece with the floor, no cold joint for water to find.

Tied rebar grid on chairs

Bar held mid-slab where it holds cracks tight, visible at the pre-pour inspection.

Compacted base and vapor barrier

Crushed base over graded clay, poly barrier under enclosed buildings to keep floors dry.

Anchor bolts set to plan

Cast-in bolts and post bases placed to the building's layout, including CJM Metals carports.

Control joints cut on time

Sawn within the first day at 8 to 15 feet depending on thickness, plus isolation joints at posts and walls.

Related work from CJM

Tell us what you need and we’ll walk through the options with you. (214) 603-9142

Common questions

How thick should a slab be for a shop or garage?

A slab for foot traffic and storage can be 4 inches. A shop or garage floor that will carry a vehicle, a lift or a loaded trailer should be 5 to 6 inches with a rebar grid, and a turn-down edge of 12 inches or more under the walls. If your building supplier or engineer provides a foundation spec, we pour to that spec.

What does a concrete slab cost in Arlington?

A 4-inch broom-finish slab in the DFW market runs roughly $8 to $14 per square foot installed. Going to 5 or 6 inches adds about 8 to 18 percent, a rebar grid adds about $0.60 to $1.10 per square foot, and tearing out an old slab adds about $2.50 to $4.50 per square foot. Our job minimum is $1,800. Use the calculator for a ballpark on your dimensions.Full answer →

Do I need a permit for a shed or shop slab in Arlington?

Per the City of Arlington's DIY permit guide, a storage shed over 100 square feet requires a permit, so only the smallest sheds are exempt. Larger sheds, shops and detached garages need a building permit, carports and patio covers have their own placement and permit rules, and a larger building may need an engineered foundation plan. Confirm your project with the City's One Start Development Center at 101 W. Abram St, 817-459-6502, before ordering the building.Full answer →

How soon can I put the building on the slab?

You can walk the slab the next day and frame light walls within a few days. Keep cars and pickups off for 7 days on a 4 or 5-inch slab and 10 days on a 6-inch slab. Heavy equipment and loaded trailers should wait 14 days on a 4 or 5-inch slab and 28 days on a 6-inch slab, since concrete reaches its design strength at about 28 days.Full answer →

Get a free quote on your slab

Tell us what is going on the slab, its footprint, and whether you have a foundation drawing or anchor layout. Call or text (214) 603-9142 and we will get you a figure.

What helps us prepare your quote
  • Share the approximate length and width, intended use, and photos of the existing area.
  • Let us know if old concrete must be removed, how equipment can reach the area, and which finish you want.
  • Thickness, reinforcement, drainage and site preparation are confirmed before the final written estimate.

— Start your project

Tell us what you want poured.

A short form, a site visit, and a written estimate within 24 hours. No pressure, no obligation.

or call(214) 603-9142Se habla español

Text us a photo and we can usually quote from it.

Add project details (optional)

Up to 3 photos. We resize phone photos automatically. You can also add them after sending.

We respond within 24 hours. No measurements required.