Sidewalks & Walkways - Arlington, TX
Sidewalks & Walkways
Front walks, side-yard paths, the run from the driveway to the back gate, and the public sidewalk out by the curb. We pour 4-inch broom-finish walkways on compacted base, 3 to 4 feet wide, pitched so water leaves and cut so the cracks land in the joints instead of across the slab.
A walkway is small concrete, but it takes every step a driveway takes: dig, compact, form, steel, pour, cut, cure. Skip one and the walk heaves with the clay or ponds at the front door. We do not skip any of them.
Front walks and side-yard paths
A front walk should be 4 feet wide so two people can pass and a stroller or a walker fits without a wheel dropping off the edge. A side-yard path can go to 3 feet, which is the narrowest we pour and the minimum clear width for an accessible route.
Straight runs form up fast with standard lumber; curves take flexible forms and more layout time but follow the landscaping. Either way we hold the walk about an inch above the finished lawn so the mower clears it, and where it meets the porch, the foundation or a driveway we set an isolation joint, because the house and the walk move at different rates in North Texas clay.
Base, thickness and steel
Four inches is the right thickness for foot traffic and what most public sidewalk across DFW is built to. We strip the topsoil and roots, compact the subgrade, and set 2 inches of compacted base before any forms go in. A walk poured straight on soft dirt rides Arlington's clay one panel at a time.
Steel holds the panels together when the ground does move: welded wire mesh or #3 rebar on chairs so it sits in the middle of the slab, adding $0.60 to $1.10 per square foot. Where a vehicle crosses the walk, at the driveway apron or a gate, we thicken the slab to match the driveway. A 4-inch walk is for feet; a tire needs more.
Slope, drainage and accessible grades
Water has to leave a walk or it stays, and in winter that is ice at the front door. We cross-slope a quarter inch per foot away from the house, about 2 percent, which is also the most cross slope the ADA allows on an accessible route. Along the direction of travel we keep the grade at or under 5 percent — steep enough to drain, flat enough to push a stroller up without thinking about it.
On a lot where the front door sits well above the street, we would rather run the walk on a gentle diagonal than pour steps. If steps are unavoidable we cast them with 7-inch risers, 11-inch treads and a broom-finished nose, and we talk about a rail before we pour: CJM Metals welds the steel handrail on it, one family covering both trades.
Broom finish, joints and cure
Broom finish is the default on a walkway for one reason: grip. We float the surface, then drag the broom perpendicular to the direction of travel so the ridges work against a slipping shoe in rain. Stamped and exposed aggregate are options if the walk should match a patio, at a higher band and with a sealer that has to keep up.
Concrete cracks; joints decide where. On a 4-foot walk we cut control joints every 4 to 5 feet so each panel is about as long as it is wide — cut every 10 feet instead and each panel cracks down the middle. More in why concrete cracks. Walk on it after 24 hours, keep furniture and anything with a point off it for 3 days, and keep it damp or under curing compound the first week. Full strength, and the soonest a sealer should go on, is 28 days.
City sidewalk replacement in Arlington
The sidewalk between the curb and your yard is public right-of-way. Arlington requires a right-of-way permit through Planning and Development Services at the One Start Development Center, 101 W. Abram St, 817-459-6502, the contractor who pulls it has to be registered with the City first, and the City's manual calls for a full-depth saw cut back to an existing joint and replacement to its Cut and Restore Pavement Detail.
Who pays depends on the section. Arlington Public Works runs a panel and sidewalk replacement program, and a damaged section can be reported through the Ask Arlington app or at 817-459-6550, so before anyone breaks out a city sidewalk in front of your house, confirm whether yours is already on a list — that call can save you the whole job. When we do the work we pull the permit, saw cut to the joint, match the neighbors' grade and pour to the City detail. A single tripping edge is often concrete repair instead. See do I need a permit for concrete in Arlington for the rest of your lot.
— What we offer
4-inch slab on compacted base
Topsoil stripped, subgrade compacted, 2 inches of base. The part that keeps it flat.
Broom finish for grip
Brushed across the direction of travel so it holds a shoe in the rain.
Pitched to drain
A quarter inch per foot away from the house, the most an accessible route allows.
Joints cut to the width
Every 4 to 5 feet on a 4-foot walk, so the cracks land in the joints.
Straight or curved
Standard forms for straight runs, flexible forms when the walk follows the beds.
City sidewalk, permit handled
Right-of-way permit, full-depth saw cut and the City's detail, done by us.
Related work from CJM
Tell us what you need and we’ll walk through the options with you. (214) 603-9142
Common questions
How much does a concrete walkway cost in Arlington?
A 4-inch broom-finish walkway runs about $8 to $14 per square foot installed. Tearing out an old walk adds $2.50 to $4.50 per square foot and rebar adds $0.60 to $1.10. Our job minimum is $1,800, so a short front walk of around 120 square feet usually lands between $1,800 and $2,250 because the crew, forms and truck cost the same whether the pour is small or not.
Do I need a permit for a sidewalk in Arlington?
A ground-level walkway inside your own lot normally does not need a building permit, but confirm with the City of Arlington's Planning and Development Services at the One Start Development Center, 101 W. Abram St, 817-459-6502, before you dig. The public sidewalk between the curb and your yard is in the City right-of-way, and work there requires a right-of-way permit pulled by a contractor registered with the City.Full answer →
How wide and how thick should a walkway be?
Four inches thick on compacted base for foot traffic. Three feet is the narrowest practical width and the minimum clear width for an accessible route; four feet lets two people pass and is the right width for a front walk. Where a mower, trailer or car crosses, thicken it to match the driveway.
When can I walk on a new sidewalk?
Foot traffic after 24 hours. Keep furniture, planters and anything heavy off for 3 days, and do not drive on it for 7 days. Concrete reaches its design strength at 28 days, which is also the earliest a sealer should go on.Full answer →
In our customers’ words
Get a free quote on your walkway or sidewalk
Tell us where it starts, where it ends and what it has to get past. Text a photo or call (214) 603-9142.
What helps us prepare your quote
- Share the approximate length and width, intended use, and photos of the existing area.
- Let us know if old concrete must be removed, how equipment can reach the area, and which finish you want.
- Thickness, reinforcement, drainage and site preparation are confirmed before the final written estimate.
— Start your project
Tell us what you want poured.
A short form, a site visit, and a written estimate within 24 hours. No pressure, no obligation.
or call(214) 603-9142Se habla español
